Skip to content

Report Planned and actual repayments 2

POST

The report shows the planned repayments indicating the actual repayments and debt as of the date of formation. The report includes tranches with the date of issue falling within the specified period FROM and TO. Analytical report

Parameters

Path Parameters

calcDate*

Date for calculating penalties and balance. Should always be current by default

Type
string
Required
Format
"date"
dateFrom*

Start date of report generation

Type
string
Required
Format
"date"
dateTo*

End date of report generation

Type
string
Required
Format
"date"

Responses

OK

*/*
object

If the element was successfully removed, then this parameter returns an empty string

Upon successful deletion of an element in the directory, the status "ok" is returned. Otherwise, an error is returned

Valid values"error""ok"

Returns the date + time (kernel) in unix timestamp format in milliseconds

Format"int64"